更新5/3/2022:
The final draft of the Astoria 海滨总体规划 was presented to the Astoria City Council's Development 委员会 for adoption on May 2, 2022. The City Council unanimously approved the plan. This was the final step in the process after the 阿斯托里亚港 adopted the plan in early April. The City of Astoria has contracted with consultant firm Walker Macy to focus on horizontal development, including changes to zoning and public infrastructure. Regular updates will be made to the public as progress is made to implement the plan's vision.
Background
The 阿斯托里亚港 海滨总体规划 is a joint effort by the Port and the City of Astoria to develop a swath of underutilized waterfront on Port property, between 码头1 and the Astoria-Megler Bridge (see attached map). The goals of the 海滨总体规划 include:
From the Port 委员会 Meeting - April 5, 2022
From 海滨总体规划 Public Meeting - December 14, 2021
From 海滨总体规划 Public Meeting - November 3, 2021
From 海滨总体规划 PAC 1 Meeting - September 15, 2021
海滨总体规划 - Signed Contract with Walker Macy
邮轮常见问题2022 -
PORT OF ASTORIA WATERFRONT MASTER PLAN PUBLIC MEETING -
UPDATED FAQS RE: PRIDE OF AMERICA NON-PASSENGER CARRYING CRUISE SHIP -
PRESS RELEASE - EAST MOORING BASIN CAUSEWAY COLLAPSE -